Difference between revisions of "Stage"

From EUTC Wiki
m (Reverted edit of 62.231.243.137, changed back to last version by Amar)
Line 1: Line 1:
 
[[Category:The Building]]
 
[[Category:The Building]]
  
It measures 29'1" by 17' and the rig is 12'6" above it at the centre and more like 12' at the balconies. The skin is made of hardboard and is tacked to varnished tongue and groove floorboards. The floorboards are full of holes and really need replaced but it won't be cheap, a few of the worst were replaced during re-skinning fringe 2002. The hardboard needs replaced every year or so a process called "re-skinning". The skin is painted with matt black paint and the easiest way to apply it is to dilute black paint with 25% water which makes it easy to spread. The speed record stands at 4 mins, 2 secs which was set half an hour before the first show of fringe 2001 by two people. The paint was further diluted with sweat. If in a rush paint can be diluted with hot water and mopped on (use an old mop you don't want back) if your in a real rush. The first few coats of paint after re-skinning should be done undiluted and it helps to mix some (no more than 10%) cheap PVC glue into the paint to toughen it. The area underneath the balconies is slightly(!) delicate and the gaffa tape should not be removed because it holds large areas of plaster up. If the ceiling falls down report it to the Works department who should come in and repair it. The back wall of the stage was rebuilt for fringe 1999 so people shouldn’t be screwing into it. There are two bolt holes which can be used for anchoring to it, there is a 2"x4" beam which fits exactly and will hold an elephant. This lives on the Balconies.
+
It measures 29'1" by 17' and the rig is 12'6" above it at the centre and more like 12' at the balconies. It is advised that no set is taller than 10’ so as not to affect the lighting adversely. There are two small trap doors on stage both on the centre line one far upstage and one about centre. Limited access is through the crypt for anyone willing to crawl through the sand and dust. There is a "grill" lid for the centre door which allows smoke and (a small amount of) light through.
  
The stage is a black studio stage 29’5” by 17’2” with an average overhead clearance to lighting rig of 12’6”.  It is advised that no set is taller than 10’ so as not to affect the lighting adversely.  There are two small trap doors on stage both on the centre line one far upstage and one about centre. Limited access is through the crypt for anyone willing to crawl through. There is a "grill" lid for one if you want... <br>There are two stage exits, both upstage far stage left and right, leading to the dressing room situated between these exits.  The dressing room doubles as the stage exit walk through. On the stage left side of the auditorium there is a space for set storage.  The stage left wall can be a curtain of blacks allowing straight access into the stage cupboard or an extension of stage space. This area has also been used as an orchestra or band pit.  
+
There are two stage exits, both upstage far stage left and right, leading to the dressing room situated between these exits.  The dressing room doubles as the stage exit walk through. The stage left wall can be a curtain of blacks allowing straight access into the stage cupboard or an extension of stage space. This area has also been used as an orchestra or band pit.
  
Original Source: Bedlam Fringe Prospectus (edited)
+
On the stage left side of the auditorium there is the scene dock, a space for set storage.
 +
 
 +
The skin is made of hardboard and is tacked to varnished tongue and groove floorboards. The floorboards are full of holes and really need replaced but it won't be cheap, a few of the worst were replaced during re-skinning fringe 2002. The hardboard needs replaced every year or so a process called "re-skinning". The skin is painted with matt black paint and the easiest way to apply it is to dilute black paint with 25% water which makes it easy to spread. The speed record stands at 4 mins, 2 secs which was set half an hour before the first show of fringe 2001 by two people. The paint was further diluted with sweat. If in a rush paint can be diluted with hot water and mopped on (use an old mop you don't want back) if your in a real rush. The first few coats of paint after re-skinning should be done undiluted and it helps to mix some (no more than 10%) cheap PVC glue into the paint to toughen it. The area underneath the balconies is slightly(!) delicate and the gaffa tape should not be removed because it holds large areas of plaster up. If the ceiling falls down report it to the Works department who should come in and repair it. The back wall of the stage was rebuilt for fringe 1999 so people shouldn’t be screwing into it. There are two bolt holes which can be used for anchoring to it, there is a 2"x4" beam which fits exactly and will hold an elephant. This lives on the Balconies.

Revision as of 14:17, 3 January 2008


It measures 29'1" by 17' and the rig is 12'6" above it at the centre and more like 12' at the balconies. It is advised that no set is taller than 10’ so as not to affect the lighting adversely. There are two small trap doors on stage both on the centre line one far upstage and one about centre. Limited access is through the crypt for anyone willing to crawl through the sand and dust. There is a "grill" lid for the centre door which allows smoke and (a small amount of) light through.

There are two stage exits, both upstage far stage left and right, leading to the dressing room situated between these exits. The dressing room doubles as the stage exit walk through. The stage left wall can be a curtain of blacks allowing straight access into the stage cupboard or an extension of stage space. This area has also been used as an orchestra or band pit.

On the stage left side of the auditorium there is the scene dock, a space for set storage.

The skin is made of hardboard and is tacked to varnished tongue and groove floorboards. The floorboards are full of holes and really need replaced but it won't be cheap, a few of the worst were replaced during re-skinning fringe 2002. The hardboard needs replaced every year or so a process called "re-skinning". The skin is painted with matt black paint and the easiest way to apply it is to dilute black paint with 25% water which makes it easy to spread. The speed record stands at 4 mins, 2 secs which was set half an hour before the first show of fringe 2001 by two people. The paint was further diluted with sweat. If in a rush paint can be diluted with hot water and mopped on (use an old mop you don't want back) if your in a real rush. The first few coats of paint after re-skinning should be done undiluted and it helps to mix some (no more than 10%) cheap PVC glue into the paint to toughen it. The area underneath the balconies is slightly(!) delicate and the gaffa tape should not be removed because it holds large areas of plaster up. If the ceiling falls down report it to the Works department who should come in and repair it. The back wall of the stage was rebuilt for fringe 1999 so people shouldn’t be screwing into it. There are two bolt holes which can be used for anchoring to it, there is a 2"x4" beam which fits exactly and will hold an elephant. This lives on the Balconies.