Difference between revisions of "Maintenance"

From EUTC Wiki
 
(5 intermediate revisions by 3 users not shown)
Line 3: Line 3:
 
Many hands make light work but it is difficult to persuade people to get up for this time on a Sunday, bribing people with breakfast occasionally happens.
 
Many hands make light work but it is difficult to persuade people to get up for this time on a Sunday, bribing people with breakfast occasionally happens.
  
== To Fix list ==
+
There is a list of stuff which really should be done on the [[Building_Improvments|Building Improvements]] Page
 
 
This is a list of things that need fixing, the numbers at the front represent the importance and the difficulty/time required to fix, each out of 10 (10 being most important/very difficult)
 
 
 
<!--Don't make this a table, keep it easy to edit-->
 
2 8 Cans - separate rings, the A and the B rings have been crossed at some stage (This was to use the functional bits of each to make one complete ring -[[User:Grible|Grible]])
 
 
 
2 5 Cans - cafe entrance, I think the signal line to the B ring has been disconnected
 
 
 
8 5 Till - release mechanism, (box office) needs to boost the voltage, extra 9V battery and connector
 
 
 
5 9 Tree - Roof, there is a tree growing on the roof, top right as you look at the front of the building, Works department have been informed
 
 
 
5 9 Rig - Bust circuits, the following circuits need fixing:any with white LX on them
 

Latest revision as of 13:57, 10 January 2008

Maintenance sessions are every Sunday from 12 till 2 because historically no one wants to rehearse during this time. These two hours allow the Theatre and Tech Managers to carry out any maintenance or repairs they have to do. The FoH manager should also use this time for general tidying emptying bins etc.

Many hands make light work but it is difficult to persuade people to get up for this time on a Sunday, bribing people with breakfast occasionally happens.

There is a list of stuff which really should be done on the Building Improvements Page